Site survey to check size of EV cars, population, easy access
Detect and inspect any existing infrastructure
Prepare the designated area for the foundation
Decide between a precast or a traditional foundation
Lay out the cables based on the pre-determined design
Connect the cable from the main power source to the ESS MDP hub.
Terminate the cable from the side of the EV charging machine itself.
Installing pavers, curbstones, tiles, and painting parking spots.
Depending on the client’s preference